Completed Projects

Below are a selection of our finished projects.

Jarvis Brook, Crowborough

A Development on the old Council Depot at Jarvis Brook comprising 26 houses and 8 flats.

We provided a full groundworks package including Acting as Principle Contractor, Site Strip, Traditional Strip Foundations, Substructure Brick and Block Work, Waterproof Concrete Walls, Foul and Storm Drainage, Water Attenuation, Section 278 Works, Masonry and Log Retaining Walls, Permeable and Non-Permeable Paving, Tarmac Surfacing Works.

Completed: June 2020


Old Rectory, High Street, Burwash

A development of 15 flats and 2 bed houses.

We provided a full groundworks package including Acting as Principle Contractor, Site Strip, Traditional Strip Foundations, Substructure Brick and Block Work, Waterproof Concrete Walls, Foul and Storm Drainage, Water Attenuation, Block and Beam Floors, Retaining Walls, Permeable and Non-Permeable Paving, Tarmac Surfacing Works.

Completed:  February 2020


Brooks Close, Newhaven

A development of 27 houses comprising of 21 x 3 bed and 6 x 4 bed.

We provided a full groundworks package including Acting as Principle Contractor, Site Strip, Traditional Strip Foundations, Substructure Brick and Block Work, Waterproof Concrete Walls, Foul and Storm Drainage, Water Attenuation, Section 278 Works, Retaining Walls, Permeable and Non-Permeable Paving, Tarmac Surfacing Works.

Completed: December 2019


London Road, Southborough

This site was developed for Brookworth Homes and provides 9 Houses (3 & 5 Beds) for private sale.

Completed: February 2019


Lyndhurst Road, Worthing

This site was a former Car Sales, Tyre and MOT Centre which was demolished to provide 9 Houses (2 & 3 Beds) for private sale.

Completed: November 2018


Silverdale, Coldwaltham

This site was developed for Stonewater Housing Association to provide 8 Houses (2 & 3 Beds).  The properties are rented accommodation.

Completed: October 2018


New House Farm, Isfield

Developed for Constantia Estates to provide 2 Houses (5 Bed) and a barn conversion for private sale.

Completed: October 2018


Elizabeth Court, Hailsham

This site was developed for Wealden District Council to provide 5 Houses (2 Beds) and 12 Flats (1 & 2 Beds). The properties are rented accommodation.

Completed: October 2018


Bohemia Road, Hastings

This project was for Optivo (formerly Amicus Horizon) and will comprise 22 Flats (1 & 2 Beds) and 10 Houses (3 Beds). These are a mixture of rented accommodation and shared ownership.

Completed: April 2018


Sumach Close, Eastbourne

A development for Eastbourne Homes comprising 13 Flats (1 & 2 Beds) for rented accommodation.

Completed: December 2017


Leap Cross, Hailsham

Site developed for Wealden District Council to provide 6 Houses (2 & 3 Beds) and 6 Flats (1 & 2 Beds) for rented accommodation.

Completed: June 2017


The Paddock, Crouch

Site developed for Brookworth Homes providing 4 Houses (5 Bed) for private sale.

Completed: June 2017


Claremont Road, Newhaven

This was a development for Southern Housing Group comprising 13 houses, the mix includes 5 pairs of semi-detached dwellings (10 units in total) and 3 detached properties. The dwellings are linear in pattern and two storeys in height with accommodation provided in the roof space. All properties are sold freehold.

Completed: February 2017


Manor Fields, Southborough

Construction of 3 x 5 bedroom detached houses arranged over ground, first and second floors.

Completed: March 2016


Sittingbourne Road, Maidstone

Development of 8 x 3 bedroom terraced houses.

Completed: December 2015


Ivy Cottages, Isfield

Development providing 2 x 1 bedroom flats and 3 x 2 bedroom houses for rent.

Completed: July 2014


» View Current Projects

Copyright 2019 Trinity Civil Engineering - Web design by 1066 Internet